Skip to content
View cart, items Free diagnostic
Free diagnostic — five minutes

Score where your engineering organization will bottleneck under the next program

Ten questions, scored out of 100 against the level an organization needs to take on a major new program without restructuring around it.

  • Free
  • About five minutes
  • See your score before giving an email
What it measures

Five places a program loses time

Late programs are rarely late because the engineering was hard. They are late because a decision waited on a meeting, two teams built to different readings of the same interface, or scope moved and the schedule did not move with it. These are the five failure modes, and each one is measurable.

  • Decision Latency

    Decisions wait on a meeting that has not been scheduled yet.

  • Interface Control

    Two teams each built to their own reading of the same interface.

  • Critical Path Visibility

    The schedule shows a critical path nobody believes.

  • Resource Contention

    Your best engineer is the critical path on four programs at once.

  • Requirements Volatility

    Scope changed; the schedule and the budget did not.

Still deciding

Ten questions. No email until you have seen your score.

The diagnostic asks how your organization behaves, not what it is building — nothing in it requires you to disclose a program, a customer or anything export-controlled. Most people finish in four to six minutes.

  • Free
  • Ten questions, about five minutes
  • See your score before giving an email